IVR Inspection Line - 206.973.4764

 

As part of the City of SeaTac’s commitment to improving customer service, the Interactive Voice Response (IVR) Inspection Line has been implemented. The IVR Inspection Line phone number is 206.973.4764 and can be used 24-hours a day to:

1. Schedule Inspections
2. Cancel Inspections
3. Retrieve Inspection Results

 

The IVR Inspection Line works with any touch-tone phone providing voice prompts and help messages to assist callers as they complete each transaction. You can schedule, cancel or reschedule any number of inspections during your call. Inspections for the next day will be accepted up until 10:00 PM on the previous work day.

 

After a transaction has been successfully completed, you will be issued a confirmation number. Please write down this confirmation number so that if you have any questions relating to your inspection, staff can better assist you.

 

Before calling the IVR Inspection Line, you will need…

1. Your Permit Number(s)
2. A 3-Digit Inspection Code – choose from the codes listed below
3. Pen and paper to write down your confirmation 

 

*To view a copy of the brochure with the codes for printing,click here

Miscellaneous Inspections
Preconstruction/Pre-demolition......... 105
Pre-reroof........................................................ 106
Demolition....................................................... 140
Stop Work....................................................... 900
Work w/o Permit......................................... 901
Remove Stop Work Order....................... 902

 

Erosion Sedimentation Control
Preconstruction..........................................125
Temporary ESC......................................... 126
Initial ESC...................................................... 127
Final ESC........................................................ 129

 

Foundation Inspections
Footing............................................................. 203
Foundation Wall............................................. 204
Concrete Slab Perimeter Insulation........... 206
Slab.................................................................. 205
Footing Foundation Drains.......................... 207

 

Building Inspections
Roof Sheathing.............................................. 320
Under-floor Framing...................................... 302
Wall Sheathing/Shear................................... 303
Suspended Ceiling....................................... 308
Framing........................................................... 305
Glazing............................................................ 306
Ceiling............................................................. 308
Wall.................................................................. 304
Insulation........................................................ 309
Cover............................................................... 307
Drywall............................................................ 310
Other................................................................ 317
Sign Final....................................................... 370
Police Final.................................................... 380
Building Final................................................ 350

 

Energy Efficiency Inspections
Insulation........................................................ 309
Duct Insulation............................................... 709
Duct Leakage Affidavit................................. 708
Energy Efficiency Certificate....................... 340

Mechanical Inspections
Rough-in Mechanical.................................. 715
Pipe and Duct Insulation............................. 709
Piping Pressure Test.................................... 705
Refrigeration Equipment (test)................... 706
Gas Piping..................................................... 704
Commercial Kitchen Hood......................... 710
Other Mechanical......................................... 711
Mechanical Final.......................................... 700

 

Electrical Inspections
Underground................................................ 213
Electrical Service......................................... 212
Rough-in/Cover .......................................... 215
Ufer Ground.................................................. 208
Other Electrical............................................. 211
Electrical Final.............................................. 260

 

Plumbing Inspections
Ground Work................................................ 501
Rough-in Plumbing.................................... 502
Waterline...................................................... 503
Other Plumbing........................................... 504
Plumbing Final............................................ 500

 

Special Inspections
SI – Concrete............................................... 910
SI – Welding................................................. 911
SI – Masonry Construction........................ 912
SI – Structural Steel.................................... 913
SI – Fireproofing......................................... 914
SI – Firestopping......................................... 915

 

Fire/Fuel Storage
Tank Pressure Test..................................... 404
Sprinkler....................................................... 411
Fire Alarm..................................................... 416
Trip Test........................................................ 417
Fire Final...................................................... 400
Fire Alarm Final........................................... 415
Fire Suppression Final............................... 410
Fuel Storage Tank Final............................. 405

 

Mobile/Modular Homes
Setback........................................................ 141
Services....................................................... 142
Site Restoration.......................................... 143
Skirting/Venting........................................... 144
Blocking/Tie Down..................................... 145
Installer Tag................................................. 146

 

Planning Inspections
Landscaping................................................ 104
Other Planning............................................ 420
Planning Final............................................. 430

 

 

Engineering Review Inspections (STE & ROW)
Job Start....................................................... 100
Clear or Grub............................................... 101
Subgrade..................................................... 102
Grading........................................................ 103
Landscaping............................................... 104
Preconstruction Meeting........................... 105
Pre-inspection............................................. 106
Waterline...................................................... 107
Storm Drainage........................................... 108
Asphalt Paving............................................ 109
Utility.............................................................. 110
Underground............................................... 111
Traffic Control.............................................. 112
Traffic Signal................................................ 113
36 Mo Maintenance................................... 119
12 Mo Maintenance................................... 120
6 Mo Maintenance..................................... 121
Final As Built............................................... 160
Annual Pressure Test................................ 122
Drainage...................................................... 130
Site............................................................... 123
Exfiltration Test........................................... 131
Engineering Final...................................... 150